CHAPTER 2 INSTALLATION
– 78 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Using Installation Cable
(1) Take the Installation cable out of the hole on the left side of the BASE, then secure the cable to
the BASE with the cord bush.
NOTE:
The installer is to use minimum 16 AWG (1.3
Ω
) size wire, maximum
φ
9 mm size cable.
(2) Wire the Installation cable and the FG cable to the FG, NEUTRAL, LINE and Ground terminals
on the BASE.
(3) Wire the AC CORD-B to the FG, NEUTRAL and LINE terminals on the BASE.
Wiring Installation Cable to Terminals when AC120 V/ 240 V Power Supply System
NOTE:
Cable colors in the parentheses are for Australia.
Continued on next page
FG CABLE
(GREEN)
HOW TO SECURE CABLES TO TERMINAL BLOCK
INSERT A SCREW DRIVER INTO THE INSIDE HOLE OF TERMINAL BLOCK.
PULL DOWN THE SCREW DRIVER TOWARD INSIDE AND OPEN THE METAL PLATE.
INSERT A POWER CABLE INTO THE OUTSIDE HOLE OF TERMINAL BLOCK.
REMOVE THE SCREW DRIVER.
1
1
2
2
3
3
4
4
AC CORD-B
INSTALLATION CABLE
TO AC
POWER
DISTRIBUTION
BOARD
TO CN1 on
PZ-PW121/PZ-PW126 in PIM
FG
NEUTRAL
LINE
TERMINAL
BLOCKS
GREEN
(GREEN/YELLOW)
BLACK (BROWN)
BLACK (BROWN)
WHITE (BLUE)
GREEN
(GREEN/YELLOW)
WHITE (BLUE)
BASE
FRONT
WIRING POWER CABLE TO TERMINALS
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...