CHAPTER 2 INSTALLATION
– 114 –
NWA-008841-001 Rev.5.0
90ch2001.fm
(3) When you need a –48 V DC power supply installed for a Cell Station (Zone Transceiver) in WCS
system or when PN-4LDT, PN-4LLC card is installed, do the following procedure. If not, skip
this procedure and go to (4).
Page 116
STEP1:
Attach four screws preliminary to the PZ-PW122 card.
STEP2:
Mount the PZ-PW122 card into the PIM which accommodates the CSI, 4LDT, 4LLC
cards, and fasten the screws.
NOTE:
Screws are attached to the PZ-PW122 card.
Mounting PZ-PW122 into PIM
PIM
PZ-PW122
POWER CABLE CONNECTION
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...