POWER CORE User Manual
Version: V6.0.0/5
55/459
7. Configuring POWER CORE
The software now creates the necessary binary configuration files, and transfers them to the Lawo control system
via the Ethernet network.
The progress of the transfer is shown in the
Console
status area at the bottom of the 'Project' window. Once the
transfer is complete you will see the lines
File loaded to unit
and
Sending Restart
. The system may take a
few seconds to restart. Once boot-up is complete, the new configuration parameters should be valid.
Project Save + Binary Files Creation
Files Transferred to Unit
If your computer’s firewall prevents the transfer, then change your firewall settings and retry.