2NL/2P8
1-4-66
9080
LED fault detection
A block is existent below a
peak which was obtained by
activating the LEDs in the four
CIS blocks at power on, which
is less than 80hex.
DP CIS
1. Execute CIS automatic original
document alignment by U411 (see page
1-3-119).
2. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
CIS and DP SHD PWB (YC2)
DP SHD PWB (YC1) and DP main PWB
(YC10)
3. If the wiring is disconnected, shorted or
grounded, replace the wiring.
4. Replace the CIS and execute U411.
DP SHD PWB
Replace the DP SHD PWB.
9100
Coin vender control PWB
error
Communication error has
been detected at the coin mec
of the coin vender control
PWB.
Coin vender control
PWB
Replace the coin mec.
9110
Coin vender rejector error
Communication error has
been detected in connection
with the coin mec and the
rejector.
Rejector
1. Check that the rejector is firmly installed
and, if not, install firmly.
2. Replace the rejector.
9120
Sensor error in coin vender
change (Yen 10)
Change is empty despite
change is enough.
Coin jam in the
change tube
Check visually and remedy.
Contact in the
connector
Check the connection of the empty change
sensor.
Change empty
sensor
Replace the coin mec.
Coin vender control
PWB
Replace the coin mec.
9130
Sensor error in coin vender
change (Yen 50)
Change is empty despite
change is enough.
Coin jam in the
change tube
Check visually and remedy.
Contact in the
connector
Check the connection of the empty change
sensor.
Change empty
sensor
Replace the coin mec.
Coin vender control
PWB
Replace the coin mec.
Code
Contents
Related parts
Check procedures/
corrective measures
Содержание TASKalfa 3010i
Страница 1: ...SERVICE MANUAL Published in September 2016 842NL11B 2NLSM06B Rev B TASKalfa 3010i TASKalfa 3510i ...
Страница 10: ...This page is intentionally left blank ...
Страница 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Страница 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Страница 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Страница 463: ...2NL 2P8 2 1 18 Figure 2 1 23 Duplex conveying section block diagram EPWB DU_SENS DU_CL_REM YC14 5 YC8 1 DUCL DUS ...
Страница 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Страница 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 568: ...DP 773 Document processor Installation Guide ...
Страница 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 602: ...PF 810 3000 sheet deck Installation Guide ...
Страница 615: ...DF 791 3000 sheet finisher Installation Guide ...
Страница 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Страница 648: ...AK 740 Bridge unit Installation Guide ...
Страница 650: ...MT 730 B Mailbox Installation Guide ...
Страница 665: ...PH 7A C D Punch unit Installation Guide ...
Страница 686: ...DT 730 B Document tray Installation Guide ...
Страница 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 732: ...FAX System W B Installation Guide ...