JOHNSON CONTROLS
51
FORM 160.72-O1 (810)
hgvraT – hot gas Bypass ratio
The percent the Hot Gas valve will open for each per-
cent the PRV’s goes below the Hot Gas Ratio Calcula-
tion
Tsp3 - hot gas Bypass Temperature Controller
Degrees below the Leaving Chilled Liquid Temperature
Setpoint that the Hot Gas Valve will begin to open.
rrsp2 – hot gas ramp rate
Rate in Percent per second the Hot Gas valve will
open.
demand limit Mode
Current / Power
Determines the source of motor limit control
Current – By CT’s on the motor leads
Power - KW meter
pre-rotation vane Minimum startup position
The minimum position for the vanes at startup
rrsp8 – prv ramp rate
Rate in Percent per second the PRV’s will open.
override off delay
Displays the time delay required for pressure overrides
to clear
Minimum evaporator pressure for Tempera-
ture
This setpoint defines the minimum evaporator pressure
required at startup before the leaving chilled liquid is
considered valid for temperature control of the Pre Ro-
tation Vanes (PRV’s)
Temperature Controller auto Mode Tempera-
ture
Displays the temperature difference between the leav-
ing chilled liquid setpoint and the leaving chilled liquid
temperature required to begin automatic control of the
Pre Rotation Vanes (PRV’s) to maintain setpoint.
seTpoinTs sCreen
SETPOINTS SCREEN
figure 17 -
3
Содержание YORK OM Titan
Страница 4: ...FORM 160 72 O1 810 JOHNSON CONTROLS 4 This Page Intentionally Left Blank...
Страница 8: ...FORM 160 72 O1 810 JOHNSON CONTROLS 8 SECTION 1 INTRODUCTION This Page Intentionally Left Blank...
Страница 12: ...FORM 160 72 O1 810 JOHNSON CONTROLS 12 SECTION 3 OPTIVIEW CONTROL CENTER This Page Intentionally Left Blank...
Страница 26: ...FORM 160 72 O1 810 JOHNSON CONTROLS 26 Evaporator Screen This Page Intentionally Left Blank...
Страница 52: ...FORM 160 72 O1 810 JOHNSON CONTROLS 52 Setpoints Screen This Page Intentionally Left Blank...
Страница 78: ...FORM 160 72 O1 810 JOHNSON CONTROLS 78 Options Screen This Page Intentionally Left Blank...
Страница 80: ...FORM 160 72 O1 810 JOHNSON CONTROLS 80 Drive Options Screen This Page Intentionally Left Blank...
Страница 96: ...FORM 160 72 O1 810 JOHNSON CONTROLS 96 History Screen This Page Intentionally Left Blank...
Страница 102: ...FORM 160 72 O1 810 JOHNSON CONTROLS 102 Trend Common Slots Screen This Page Intentionally Left Blank...
Страница 104: ...FORM 160 72 O1 810 JOHNSON CONTROLS 104 Custom Screen This Page Intentionally Left Blank...
Страница 118: ...FORM 160 72 O1 810 JOHNSON CONTROLS 118 SECTION 3 OPTIVIEW CONTROL CENTER This Page Intentionally Left Blank...
Страница 136: ...FORM 160 72 O1 810 JOHNSON CONTROLS 136 SECTION 5 SYSTEM COMMISSIONING This Page Intentionally Left Blank...