
58
CMC TECHNICAL REFERENCE MANUAL
1X36003 Version 2.52
1996-1999 Ingersoll-Rand Company
Date of Issue: 18-Oct-1999
Checking proper operation of the BCM and wiring
VCS #1
1. With control power off, lift the wires at J3 for the suspected circuit and install a test meter
capable of reading milliamps as shown below, (the pin numbers are found on the
electrical schematic).
2. Restore control power.
3. If the meter reads 4 mA , the BCM is satisfactory.
4. If 4 mA is not present, refer to the section titled “Control Power System”.
5. Restore connections.
6. Remove control power.
7. Lift wires at suspected I/P, and install meter as in previous step.
8. Restore control power.
If the meter reads 4 mA, the BCM and wiring is satisfactory.
J3
-Analog Outputs, (4-20mA) Channels 1-4
J1-
Grounded Analog Inputs,
(4-20mA) Channels 3-23
Pin 1
Pin 25
BCM
Pin 1
VDC
mA
VAC
Ω
mA COM V
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
Ω