COMMISSIONING
44
Installation and Maintenance
Section 5 - Commissioning
5.1 PRE-COMMISSIONING CHECKLIST
ᘐ
WARNING: It must be made sure that is completed
prior to any further action. Further actions are not
permitted, and the safety of the system is not verified
unless each check has been done and positively
confirmed.
Table 10 Control Box - Pre-Commissioning Checklist
Does the circuit comply with the appropriate building
regulations, and legislation?
Does the circuit have the necessary safety devices
installed?
Do electrical components of the circuit and surrounding
areas have their electrical supply switched off or are
reasonably protected from potential water leaks/sprays?
Are all drainage valves (and any other valve that open
the circuit) closed?
Are automatic-air-vent dust caps open?
Have adequate antifreeze measures been installed in
the system (not including dosing)?
Содержание Logic Air DHW IDEPLUHP180DUOPPSZ
Страница 80: ...80 Installation and Maintenance Appendix 1 1 SYSTEM SCHEMATICS 1 1 1 Schematics Key Legend...
Страница 81: ...Appendix 81 Installation and Maintenance 1 1 2 Logic Air Two Zone Pre Plumbed Cylinder with Integrated Buffer...
Страница 82: ...Appendix 82 Installation and Maintenance 1 1 3 Logic Air Single Zone Pre Plumbed Cylinder...
Страница 92: ...92 Installation and Maintenance Notes...
Страница 93: ...93 Installation and Maintenance Notes...