Section 3 - Pre-Installation Checks
PRE-INST
ALLA
TION
27
Installation and Maintenance
3.5 CONTROL BOX - INSTALLATION AREA
3.5.1 Product Dimensions and Installation Clearances
ᘐ
CAUTION: The product is not to be obstructed by any surrounding objects or surfaces as this can limit access and
adversely affect performance. The minimum clearances that are shown in
Figure 21
should be always maintained.
3.5.2 Determining Installation Area
The proposed installation site should be explained, discussed,
and agreed with the client prior to the start of installation. It
should be accessible for the specific end user for control of the
heating system.
Both power cables and communication cable routing should be
considered when selecting an installation site.
3.5.3 Requirements of Installation Area
If installing the Logic Air Pre-Plumbed (PP) cylinder with
mounted control box, refer to Section
2.3
–
2.6
for dimensions,
access, and clearance requirements.
If installing a third-party cylinder and separate control box,
refer to Section
2.4.1
for control box dimensions, access, and
clearance requirements.
Precautions should be put in place to protect the control box
from damage e.g. impact, splashing, etc.
The installation site is to be free from water, high levels of
humidity, or debris as this can cause malfunction or damage
in the control box. The installation site must not exceed the
operating temperature or humidity tolerances given in
Table 1.
The installation site must be free from the influence of
electromagnetic, electrostatic, or magnetic fields, and not be
mounted in direct sunlight.
The proposed installation site should be explained, discussed,
and agreed with the client prior to the start of installation. The
site must be accessible for the end user.
The installation site must consider the routing of power supply
electrical cables and interconnecting cables for sensors. Make
sure adequate segregation is achieved.
Содержание Logic Air DHW IDEPLUHP180DUOPPSZ
Страница 80: ...80 Installation and Maintenance Appendix 1 1 SYSTEM SCHEMATICS 1 1 1 Schematics Key Legend...
Страница 81: ...Appendix 81 Installation and Maintenance 1 1 2 Logic Air Two Zone Pre Plumbed Cylinder with Integrated Buffer...
Страница 82: ...Appendix 82 Installation and Maintenance 1 1 3 Logic Air Single Zone Pre Plumbed Cylinder...
Страница 92: ...92 Installation and Maintenance Notes...
Страница 93: ...93 Installation and Maintenance Notes...