Section 4 - Installation
INST
ALLA
TION
39
Installation and Maintenance
Note: Section
4.3.1
is only applicable if using a non pre-
plumbed cylinder, as the control box will be packaged and
supplied separately.
Hang the wall mounting template supplied on the wall, using a
spirit level.
The control box is to be mounted using 4 fixing holes which
are indicated in
Figure 40
onto the wall mounting template.
It is the responsibility of the installer to determine appropriate
fixings for fitting the control box and being held by the wall
material. Once fixed, the control box should be rigid and
sturdy.
4.3.3 Mounting
Figure 40. Front Panel Mounting
4.3.4 Electrical Installation
ᘐ
WARNING: All electrical work is to be done by
a competent electrician. The electrical supply is to
be switched off with appropriate safety measures in
place to prevent accidental activation. The electrical
installation must be done on the Heat Pump first and
connection to the supply must be the last connection
made to reduce risk of electric shock.
ᘐ
WARNING: This product must be earthed, and
it must not be possible to disconnect the protective
conductor through any isolator switches.
Electrical installations must comply with the requirements
and guidance of the IET Wiring Regulations BS 7671, and
these guidelines are to be used to determine the cross-
sectional area of the electrical cable.
The electrical installation must be installed in accordance
with the specification in
Table 1 on page 8
.
ᘐ
CAUTION: Incorrect installation of the electrical
supply can lead to the destruction of the electrical
components in the Heat Pump and any other unit that it
is connected to.
Cables that are connecting to the Heat Pump are to
be routed through the cable glands and through to the
circuit board as shown in
Figure 34
.
Power cables and
communication/signal cables must be separated by a
minimum distance of 100mm and routed through separate
gland to prevent electrical interference.
ᘐ
CAUTION: When routing cables, care should be
taken to make sure that water is not able to run down
the cables and enter the product by making sure that
the cable is routed downwards after leaving the product
and that the cable glands are tightly fitted.
Connections are to be made using the plastic terminal
connectors supplied within the control box. When making
connections to the electrical terminals make sure that there
is no exposed copper wire and that consistent torque values
are in line with
Figure 35
.
Multi core cables should be stripped back by at least 60mm
to allow for easy connection and to reduce strain on the
terminals. Once all connections have been made, the cables
are to be secured using the cable securing clamps at the
base of the control board, to prevent stress on the terminals.
Содержание Logic Air DHW IDEPLUHP180DUOPPSZ
Страница 80: ...80 Installation and Maintenance Appendix 1 1 SYSTEM SCHEMATICS 1 1 1 Schematics Key Legend...
Страница 81: ...Appendix 81 Installation and Maintenance 1 1 2 Logic Air Two Zone Pre Plumbed Cylinder with Integrated Buffer...
Страница 82: ...Appendix 82 Installation and Maintenance 1 1 3 Logic Air Single Zone Pre Plumbed Cylinder...
Страница 92: ...92 Installation and Maintenance Notes...
Страница 93: ...93 Installation and Maintenance Notes...