
18 ENGINE
18.5.3
Installing the shift forks
•-
18.5.4
Installing the shift drum
18.5.5
Installing the shift rails
169
-
Shift fork
O
has a smaller inside diameter; mount this in the shift groove of the
main shaft.
-
Mount shift fork @ in the lower shift groove of the countershaft.
-
Mount shift fork (D in the upper shift groove of the countershaft.
-
Slide on shift rollers
8.
Tip
Fix the shift rollers in the shift forks with grease.
-
Push shift drum
O
into the bearing seat.
Put shift forks @ in the shift drum.
Info
Do not misplace the shift rollers.
-
Install shift rail
O
together with upper spring @ and the lower spring.
-
Install shift rail (D together with upper spring
8.
Содержание FE 350 2014
Страница 2: ......
Страница 241: ...29 WIRING DIAGRAM Components A11 EFI control unit 832 Fuel level indicator F1 Fuse P13 Speedometer 239 ...
Страница 253: ...29 WIRING DIAGRAM Components A11 EFI control unit 832 Fuel tank sensor F1 Fuse P13 Speedometer 251 ...
Страница 272: ...32 SPECIAL TOOLS 270 Nitro en filling tool Art no T170S1 2x 3x T170S1 H00855 01 ...