Power Line Carrier ____________________________________________________________________
RF-MCGARDPRO
Hubbell Power Systems, Inc.
–
RFL™
Products
July 1, 2022
©2022 Hubbell Incorporated
5-19
Menu location: Test > PLC > In this example 2F is selected.
1
3
2
4
5
Figure 5-9. FSK Test
1.
Force TX Carrier State:
Forces the carrier to one of five states as follows: Normal
Operation, Force Off, Force On Low Frequency, Force On Center Frequency and Force
On High Frequency.
2.
Activate:
Click to activate a change in the carrier state. The following confirmation
window will display. Click “Send Command,” an additional confirmation window will
briefly display to indicate either success or failure of the change in state.
3.
Current Force Carrier State:
Once the carrier state has been changed and the command
sent and verified, the change in state will be displayed here.
4.
These status settings are derived from the FSK configuration web page and displayed here
for reference.
5.
PLC Module Logic Bus Outputs:
Enables or disables the Logic Bus Outputs. Once a
change is made click the “Activate” button to change the Logic Bus Output state.