![horsch Leeb 5.280 VL Скачать руководство пользователя страница 255](http://html1.mh-extra.com/html/horsch/leeb-5-280-vl/leeb-5-280-vl_operating-instructions-manual_2164087255.webp)
Draining the spraying mixture container
via the pressure output
Water systems Basic Pro and CCS Pro
Pressure
output
1.
Couple a discharge hose with 2″ Camlock
coupling on the pressure output.
NOTE
Drainage output can be controlled with the ball
valve.
If the valve is fully open, the pump delivers with
full output via the pressure output.
2. Switch on the circulation on the terminal.
3. Drain the spraying mixture container.
4.
After drainage switch off the circulation to
shut off the pump.
5. Close the ball valve and remove the dis-
charge hose.
6. Close the pressure output with the cap.
250
251
Содержание Leeb 5.280 VL
Страница 2: ......
Страница 5: ......
Страница 11: ...7...
Страница 199: ...Vehicle GPS antenna calibration With standard tyres VF520 85 R46 Tyre radius 915 mm Track width 195...
Страница 219: ...Diagram a with example 215...
Страница 225: ...221...
Страница 228: ...5 1 2 8 9 10 13 12 23 26 28 224...
Страница 230: ...26 39 40 42 43 45 226...
Страница 234: ...44 1 2 5 8 9 10 16 25 12 14 230...
Страница 236: ...44 50 45 44 47 48 232...
Страница 279: ...Central frame middle frame tractor link arm Parallelogram lock 275...
Страница 307: ......