4 Planning and installation – Installing the heating system
60
19.
Slide the ash removal door (1) onto the two ash removal augers
(4).
20.
Bolt on the ash removal door (1) with the long screw (3) and four
19 mm M12 short screws (2).
21.
If necessary, align the ash removal augers (4) with the screws of
the ash removal door (2 + 3).
✓
The ash removal door is attached.
A
TTACHING
THE
COVER
PLATE
OF
THE
ASH
REMOVAL
DOOR
22.
Position both clamp handles so that they are horizontal.
23.
Insert the cover plate (1) below with the recesses in the guides (2)
on the boiler.
24.
Press the cover plate (1) above into the pre-mounted shaped
studs on the boiler.
✓
The cover plate of the ash removal door is attached.
✓
The automatic ash removal system is installed.
Important!
The two ash removal augers for the ash removal door do not come
into contact when installed.
Because of the soft seal, the screws should not be screwed in up to
the stop. Only tighten until a resistance is detected.
Figure 4/22 - Attaching the cover plate of the ash removal door
1
2
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......