7 Cleaning and servicing the heating system – Requirements
151
C
HECKING
AND
EMPTYING
ASH
CONTAINERS
(
WITH
ASH
REMOVAL
SYSTEM
)
1.
Set the control to the operating mode
OFF
.
✓
The
OFF
symbol lights up.
2.
Allow the fire in the heating system to burn out and cool down.
3.
Turn the main switch off.
4.
Release the star-grip screws (2).
5.
Lift up the lid (4) and remove it.
6.
Check the fill level of the ash containers (5).
7.
If the ash containers (5) are full, empty them.
8.
Pull the transport handle (3) upward.
9.
Lift up the clamp handle (6) and release the stop on the ash con-
tainer (5).
10.
Pull the ash container (5) forward away from the ash channel (1) of
the ash removal system.
11.
Empty the ash into a fireproof container.
12.
If the ash containers (5) are not yet full, reclose them.
13.
Mount the lid (4) on the ash container (5) and install the ash con-
tainer (5) in the boiler in the reverse sequence.
Important!
✎
See “Generally applicable safety instructions” in this section.
Caution!
Danger of fire from combustion residues
Hot combustion residues can lead to a fire.
Allow the ash to cool and place it only in a suitable fireproof con-
tainer.
Figure 7/6 - Checking and emptying ash containers (with ash removal system)
4
5
6
3
2
1
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......