6 Using the heating system – Structure of the menus
140
11 - H
EAT
CIRCUIT
2
12 - H
EAT
CIRCUIT
3
13 - H
EAT
CIRCUIT
4
14 - H
EAT
CIRCUIT
5
15 - H
EAT
CIRCUIT
6
16 - D
OMESTIC
HOT
WATER
1
10-23 Heat circuit 1
Hold time
Screed drying
(4) 4 d
•
Holding time for screed drying
Set the time to maintain the maximum supply tempera-
ture during screed drying.
(0 - 20 d)
10-24
Start screed drying
no
yes
•
Preselected screed drying program is started.
No.
Display
Description
Table 6/12 - System level / 10 - Heating circuit 1
The layout of the parameter structure in service level
11-Heat
circuit 2
is identical to service level
10-Heat circuit 1
.
The layout of the parameter structure in service level
12-Heat
circuit 3
is identical to service level
10-Heat circuit 1
.
The parameter groups
13-Heat circuit 4
,
14-Heat cir-
cuit 5
and
15-Heat circuit 6
are only available if an addi-
tional heating circuit module is installed.
The layout of the parameter structure in service levels 13, 14, and 15
are identical to service level
10-Heat circuit 1
.
No.
Display
Description
16-01
DHW 1
Set temperature
( 60) 60°
•
Preset temperature for the hot water tank
Set the temperature of the hot water tank.
(20 - 100 °C)
16-02
Prog. 1 DHW1
Mo Tu We Th Fr Sa Su
On 00:00 On 00:00
Off 24:00 Off 00:00
•
Heating times for the hot water tank
Time block 1: Various enable times can be defined for the
individual days of the week.
✎
See page 104.
16-03
Prog. 2 DHW1
Mo Tu We Th Fr Sa Su
On 00:00 On 00:00
Off 00:00 Off 00:00
•
Heating times for the hot water tank
Time block 2: Various enable times can be defined for the
individual days of the week.
✎
See page 104.
Table 6/13 - System level / 16 - Domestic hot water 1
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......