
3 Mode of operation – Overview
16
HDG C
OMPACT
25/35
FRONT
SIDE
1 Combustion chamber temperature sensor
2.
Control unit of HDG Compatronic
3 Cleaning system drive
4 EMERGENCY STOP
5 Flue gas fan
6 Lambda sensor
7 Flue pipe connection
8 Flue gas temperature sensor
9 Heat exchanger surfaces with cleaning turbulators in between
10 Ash removal augers
11 Tilting grate
12 Combustion chamber primary burning
13 Ignition pipe
14 Feeding system
15 Combustion chamber secondary burning
Figure 3/1 - Front side of the HDG Compact 25/35 boiler
13
8
6
5
4
3
2
15
14
7
1
12
11
9
10
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......