6 Using the heating system – Structure of the menus
137
10 - H
EATING
CIRCUIT
1
9-14
Accumulator
Peak load
delayed
( 15)
15m
•
Peak load switch-on
If the temperature falls below this value and this time has
elapsed, the peak-load boiler is enabled.
(0 - 90 m)
9-15
Accumulator
Peak load
Minimum runtime
( 10)
10m
•
Peak load shut-off
The peak-load boiler runs for at least this amount of time
upon being activated.
(0 - 90 m)
9-16
Accumulator
Acc. house 1 bottom
(End heating up)
( 65)
65°
•
Accumulator house 1
After exceeding this temperature on the accumulator
house 1, bottom, the boiler switches off.
9-17
Accumulator
Acc. house 1 top
(Start heating up)
( 60)
60°
•
Accumulator house 1
After falling below this temperature on the accumulator
house 1, top, the boiler switches on.
9-18
Accumulator
Acc. house 2 bottom
(End heating up)
( 65)
65°
•
Accumulator house 2
After exceeding this temperature on the accumulator
house 2, bottom, the boiler switches off.
9-19
Accumulator
Acc. house 2 top
(Start heating up)
( 60)
60°
•
Accumulator house 2
After falling below this temperature on the accumulator
house 2, top, the boiler switches on.
No.
Display
Description
Table 6/11 - System level / 9 - Accumulator
Important!
Low temperature circuits must be switched via thermostats.
To display the menu windows from parameter
Screed drying
10-18
onwards,
Underfloor heating
must be set as the
system for heating circuit 1.
No.
Display
Description
10-01
Operation HC 1
Off
Reduce
Heating
Automatic
•
Operating status
Set the operating status of the heating circuit.
Table 6/12 - System level / 10 - Heating circuit 1
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......