4 Planning and installation – Connections
43
Delivery version 5 - pellet vacuum container
1 noise insulation hood
2 Fill level indicator
3 Feeding system
4 Pellet vacuum container
5 Pellet suction line
6 Pellet delivery auger
4.2 Connections
C
HIMNEY
The benefits of the HDG Compact 25 - 80 can only be reaped if all of
the factors necessary for good combustion are carefully adjusted.
The heating system and chimney form a single functional unit and
must be adapted to one another in order to guarantee fault-free and
economical operation.
Since the flue temperature may lie below 100°C when the system is
partially loaded, a chimney/flue is required which meets the require-
ments of DIN EN 13384-1: 2003-03 “Thermal and fluid dynamic calcu-
lation methods”. If it does not meet this standard, contact your
specialist heating company or chimney technician.
Figure 4/6 - Delivery system version 5
1
2
3
4
5
6
According to EN 303-5, the entire flue system must be installed in
such a way that contamination, condensation and insufficient flue
draught are avoided. Here it is to be noted that, in the accessible
operational area of the boiler, flue gas temperatures of less than 160
K above room temperature may arise.
✎
The required flue gas values are listed in chapter “3 Mode of ope-
ration”, section “3.3 Technical data”.
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......