6 Using the heating system – Filling the fuel bunker
107
6.8 Filling the fuel bunker
R
EQUIREMENTS
The following requirements must be met before the fuel bunker can
be filled.
•
The fuel bunker must have initially been approved by an autho-
rised specialist.
•
The fuel bunker must be dry and free of any foreign bodies.
•
The requirements of government safety organisations must be
met.
P
ROCEDURE
FOR
FILLING
WITH
WOOD
FUEL
PRODUCTS
1.
Turn the heating system main switch on.
✓
The control is activated.
✎
See section “6.2 Switching on the heating system” in this chapter.
2.
Check whether the delivery system is running.
Combustion chamber
temperature stop
•
The maximum permitted temperature in the combus-
tion chamber has been exceeded.
•
The heating system waits until the combustion cham-
ber falls back below the maximum permitted tempera-
ture.
frost protection
•
The main switch is turned on.
•
Frost protection and the protective programs are
active.
•
This operating status is maintained until a change is
made to a different status.
Domestic hot water
•
Together with the HDG Hydronic heating circuit con-
trol, it is possible to implement summer operation.
•
In this mode the anti-frost and protective functions are
active.
•
Only hot water is heated.
Boiler switched off
•
The main switch has been turned off.
•
All functions are disabled.
Operating status
Operating
mode
Description
Table 6/1 - Operating statuses
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......