6 Using the heating system – Structure of the menus
129
6-04
Cleaning
Burn out before
emptying grate
( 15)
15m
•
Tip grate
Length of burning out phase prior to grate emptying.
(0 - 200 h)
6-05
Cleaning
Time
tipping up
( 150)
150s
•
Tip grate
Preset duration of the tipping up of the grate (from the
horizontal to the vertical).
(0 - 300 s)
6-06
Cleaning
Time
duration
( 420)
420s
•
Tip grate
Total time of the grate emptying procedure.
(0 - 900 s)
6-07
Cleaning
Monitor
tipping up
( 40)
40s
•
Tip grate
After the set time has elapsed, the grate should be off the
monitoring limit switch.
(0 - 300 s)
6-08
Cleaning
Monitor
tipping down
( 240)
240s
•
Tip grate
After the set time has elapsed, the monitoring limit switch
should not yet be triggered.
(0 - 900 s)
6-09
Cleaning
Ash auger
impulse time
( 100)
100s
•
Ash auger impulse
Running time of the ash auger when grate emptying is
activated.
(0 - 999 s)
6-10
Cleaning preselection
None
Manual
Automatic
•
Setting of the cleaning system
6-11
Cleaning system
Off
On
•
Cleaning system
Switch automatic cleaning of the heat exchanger surfaces
on or off.
6-12
Cleaning
Cleaning after
operating hours
( 24)
24h
•
Cleaning system
Number of operating hours after which the cleaning func-
tion switches on during continuous operation of the sys-
tem.
(0 - 100 h)
6-14
Cleaning
Number of
cleaning cycles
( 5)
5
•
Cleaning system
Number of up and down movements of the automatic
cleaning system.
(1 - 250)
No.
Display
Description
Table 6/8 - System level / 6 - Cleaning
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 80 Operation Manual ...
Страница 2: ......
Страница 186: ...12 Index 186 HDG Compact 25 35 Version 2 de HDG Bavaria GmbH Oktober 2007 ...
Страница 187: ......