GE Multilin
G60 Generator Protection System
7-9
7 COMMANDS AND TARGETS
7.2 TARGETS
7
•
Description of problem
: A bad IRIG-B input signal has been detected.
•
How often the test is performed
: Monitored whenever an IRIG-B signal is received.
•
What to do
: Ensure the following:
–
The IRIG-B cable is properly connected.
–
Proper cable functionality (that is, check for physical damage or perform a continuity test).
–
The IRIG-B receiver is functioning.
–
Check the input signal level (it may be less than specification).
If none of these apply, then contact the factory.
•
Latched target message
: No.
•
Description of problem
: No PTP enabled port has good PTP signal input.
•
How often the test is performed
: Activated when no acceptable signal is being received.
•
What to do
: Ensure the following:
–
The Ethernet cable(s) are properly connected.
–
At least one PTP grandmaster-capable clock is functioning.
–
If strict PP is enabled, that entire network is PP compliant.
–
The network is delivering PTP messages to the relay.
•
Latched target message
: No.
•
Description of problem
: An Ethernet connection has failed.
•
How often the test is performed
: Monitored every five seconds.
•
What to do
: Check Ethernet connections. Port 1 is the primary port and port 2 is the secondary port.
•
Latched target message
: No.
•
Description of problem
: The SNTP server is not responding.
•
How often the test is performed
: Every 10 to 60 seconds.
•
What to do
: Check SNTP configuration and network connections.
•
Latched target message
: No.
•
Description of problem
: A discrepancy has been detected between the actual and desired state of a latching contact
output of an installed type “4L” module.
•
How often the test is performed
: Upon initiation of a contact output state change.
•
What to do
: Verify the state of the output contact and contact the factory if the problem persists.
MAINTENANCE ALERT:
**Bad PTP Signal**
MAINTENANCE ALERT:
Port ## Failure
MAINTENANCE ALERT:
SNTP Failure
MAINTENANCE ALERT:
4L Discrepancy
Содержание Multilin g60
Страница 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Страница 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 130: ...3 68 G60 Generator Protection System GE Multilin 3 4 FIELD AND STATOR GROUND MODULES 3 HARDWARE 3 ...
Страница 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Страница 538: ...8 6 G60 Generator Protection System GE Multilin 8 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 8 THEORY OF OPERATION 8 ...
Страница 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Страница 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...