GE Multilin
G60 Generator Protection System
5-63
5 SETTINGS
5.2 PRODUCT SETUP
5
d) LOCAL TIME
PATH: SETTINGS
PRODUCT SETUP
REAL TIME CLOCK
LOCAL TIME
The UR device maintains two times: local time and Universal Coordinated Time (UTC). Local time can be provided by IRIG-
B signals. UTC time is provided by SNTP servers.
The real-time clock (RTC) and timestamps reported in historical records and communication protocols can be incorrect if
the Local Time setting is not configured properly. When the RTC is synchronized with IRIG-B, Local Time must be config-
ured for the current location or else the timestamps may not be accurate.
The
LOCAL TIME OFFSET FROM UTC
setting is used to specify the local time zone offset from UTC (Greenwich Mean Time) in
hours. Time zones in the eastern hemisphere have positive values; time zones in the western hemisphere have negative
values. A value of zero causes the relay to use UTC for local time. This setting has two uses. When the system RTC is syn-
chronized with a communications protocol providing only local time or it is free-running, the offset setting is used to calcu-
late UTC from the local time these provide. When the RTC is synchronized with a communications protocol providing only
UTC (such as PTP or SNTP), the time offset setting is used to determine local time from the UTC provided. PTP
ALTERNATE_TIME_OFFSET_INDICATOR TLVs are not used to calculate local time. When a communications protocol
other than PTP provides UTC to local time offset (meaning IRIG-B), that offset is used instead of the local time and daylight
time settings.
The
DAYLIGHT SAVINGS TIME (DST)
settings can be used to allow the relay to follow the DST rules of the local time zone.
Note that when IRIG-B time synchronization is active, the local time in the IRIG-B signal contains any daylight savings time
offset and so the DST settings are ignored.
LOCAL TIME
LOCAL TIME OFFSET
FROM UTC:
0.0 hrs
Range: –24.0 to 24.0 hrs in steps of 0.5
MESSAGE
DAYLIGHT SAVINGS
TIME: Disabled
Range: Disabled, Enabled
MESSAGE
DST START MONTH:
January
Range: January to December (all months)
MESSAGE
DST START DAY:
Sunday
Range: Sunday to Saturday (all days of the week)
MESSAGE
DST START DAY
INSTANCE: First
Range: First, Second, Third, Fourth, Last
MESSAGE
DST START HOUR:
2
Range: 0 to 23
MESSAGE
DST STOP MONTH:
January
Range: January to December (all months)
MESSAGE
DST STOP DAY:
Sunday
Range: Sunday to Saturday (all days of the week)
MESSAGE
DST STOP DAY
INSTANCE: First
Range: First, Second, Third, Fourth, Last
MESSAGE
DST STOP HOUR:
2
Range: 0 to 23
Содержание Multilin g60
Страница 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Страница 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 130: ...3 68 G60 Generator Protection System GE Multilin 3 4 FIELD AND STATOR GROUND MODULES 3 HARDWARE 3 ...
Страница 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Страница 538: ...8 6 G60 Generator Protection System GE Multilin 8 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 8 THEORY OF OPERATION 8 ...
Страница 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Страница 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...