●
NIBP Test
The NIBP function is tested.
Each test begins when the START/STOP key is pressed.
When the ALL TEST START/STOP key is pressed, all the tests will be done automatically.
A faulty NIBP module is to be considered if there is “NG" for result on the test display.
Inflation Time
The inflation performance of the NIBP pump is tested.
When the result of the test is "NG", faulty NIBP pump is to be considered.
Air Leak Value
Air Leakage is tested with the dump valve and the bleed valve being closed.
When the result of the test is "NG", a faulty dump valve or bleed valve is to be considered.
Exhaust (5mmHg/sec)
The speed control of the bleed valve is tested (low-speed).
When the result of the test is "NG", a faulty bleed valve is to be considered.
Exhaust (10mmHg/sec)
The speed control of the bleed valve is tested (high-speed).
When the result of the test is "NG", a faulty bleed valve is to be considered.
Rapid Exhaust
The exhaust control of the dump valve is tested.
When the result of the test is "NG", a faulty dump valve is to be considered.
Status
It displays whether each test ended normally.
7
-
13
Содержание DynaScope 7000 Series
Страница 46: ...MGU 701 MGU 702 Multigas Unit Optional Weight 1 8kg 1 6 ...
Страница 47: ...2 1 Specification Chapter 2 Specification Performance 2 2 Specification 2 2 Performance 2 3 ...
Страница 70: ...4 4 Blank Page ...
Страница 71: ...Software Upgrade Chapter 5 Software Upgrade 5 2 Software Upgrade Verification 5 4 5 1 ...
Страница 92: ...6 18 Blank Page ...
Страница 143: ...39 4 Hongo 3 chome Bunkyo ku Tokyo Japan Phone 81 3 3815 2121 Fax 81 3 3814 1222 Printed in Japan 4R0100110 200805 ...