Chapter 4 Operation
46
The following program is used as an example to help you with program
setup. In it, steps 1 ~ 3 are run three times (repeated twice), then step 4
is run and power is shut OFF at program end. When actually creating
programs, use the Program Sheet in Appendix G. It is wise to create
your programs on paper before trying to input them at the cabinet .
Step 1 Temperature 20
Humidity
80%RH 1
h
Step 2 Temperature -20
Humidity control OFF 2 h
Step 3 Temperature 85
Humidity
50%RH 1.5
h
Ramp control ON
Repeated
twice
Step 4 Temperature 20
Humidity control OFF 1 h
Soak control ON
1 repeat cycle 2 repeat cycle
2
2
2
4
Number of steps
Temperature
and humidity
link control
Humidity
control ON/OFF
ON
ON
ON
ON
20
-20
85
20
ON
OFF
ON
OFF
80
50
1:00
2:00
1:30
1:00
OFF
OFF
OFF
ON
OFF
ON
OFF
OFF
OFF
1:00
2:00
1:30
1:00
Target humidity
Humidity ramp
control ON/OFF
100
50
0
-20
Temperature
Humidity %RH
Temperature
Humidity
7
1
2
3
4
5
6
8
9
7
1
2
3
4
5
6
8
9
Step No.
Time (h:min)
Step No
.
Repeat setup
End mode setting
HOLD
OFF
CNST
Number of repeat cycles (2)
Start step (1)
End step (3)
: No setting made
Soak control
Target
temperature
Step exposure
time
Temperature
ramp control
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com