
Chapter 4 Operation
35
4. Lay the ends of the wet-bulb wick in the wick pan.
Wick pan
Align wick tail edge with
sensor tip.
Dry-bulb
temperature
sensor
Wet-bulb
temperature
sensor
Wet-bulb wick
Do not insert the sensor into the
bottom hole. The wick will not
drape at the correct height for
absorbing water.
4.10 How to set the wet-bulb wick 2
Wick Pan Water Level Check
(Not necessary with LU cabinet)
1. Check water in the wick pan is at the level shown in the below figure.
Wick Pan
Normally
about 8 mm
Fig. 4.11 Wick pan water level
2. It takes time to fill the wick pan with water.
3. If water level is low (high), slightly reposition the wick pan water
supplier higher (lower) on the back wall of the water circuit
compartment.
Water Tank Water Level Check
(Not necessary with LU cabinet)
Check water level in the water tank. If low, add water as explained in
"3.4 Water Level Check".
Procedure
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com