Chapter 3 Installation
20
Chapter 3 Installation
This chapter explains how to install the cabinet and prepare for tests. Be
sure to read the parts on installation even if having the cabinet installed
by the place of purchase or ESPEC CORP. Also, refer to this chapter
whenever relocating the cabinet.
3.1 Installation
Installation Site Check
This section describes installation site and space requirements.
Installation site
Install the cabinet in a place which satisfies the following conditions.
•
On a flat, level floor which is strong even to bear the weight of the
equipment.
•
Where subjected to only minimal mechanical vibrations
•
Where not exposed to direct sunlight but which is well-ventilated
•
Where ambient temperature is +5 ~ +35°C and free of sharp
temperature fluctuations
•
In a dust-free room
•
Which is not exceptionally wet or humid
•
Away from flammables and explosives
•
Where not exposed to combustible or corrosive gases
•
Near to power, water and drainage utilities
•
Not directly underneath or near to fire alarms
Cabinet working temperature range is 0 ~ 40°C. Using the cabinet
outside of this range will lead to equipment trouble.
Note