
A
B
C
D
E
F
G
H
L
M
N
P
Comandi - Dispositivi
Controls - Devices
sezione / section
F 4
18
Monster S2R 1000
- M.Y. 2006 - edizione/edition 00
Verificare che il tubo (7) di collegamento
pompa-pinza freno posteriore sia
posizionato come in figura.
Operazioni
Rif Sez.
Riempire l’impianto
frenante
D 4
Check that master cylinder-caliper
hose (7) is routed as shown in the
figure.
Operation
See Sect.
Fill the brake circuit
D 4
40
–2
45
–2
7
Содержание 2006 Monster S2R 1000
Страница 10: ......
Страница 11: ...A B C D E F G H L M N P Generalit 0 Description 0...
Страница 24: ......
Страница 25: ...A B C D E F G H L M N P Informazioni sul modello 0 Model specific information 0...
Страница 29: ...A B C D E F G H L M N P Caratteristiche tecniche 0 Technical specification 0...
Страница 65: ...A B C D E F G H L M N P Uso e manutenzione 0 Use and Maintenance operations 0...
Страница 129: ...A B C D E F G H L M N P Vestizione 0 Fairing 0...
Страница 141: ...A B C D E F G H L M N P Comandi Dispositivi 0 Controls Devices 0...
Страница 164: ......
Страница 165: ...A B C D E F G H L M N P Ruote Sospensioni Freni0 Wheels Suspensions Brakes 0...
Страница 219: ...A B C D E F G H L M N P Mototelaio 0 Frame 0...
Страница 245: ...A B C D E F G H L M N P Impianto di alimentazione Scarico 0 Fuel system Exhaust system 0...
Страница 281: ...A B C D E F G H L M N P Impianto iniezione accensione 0 Ignition injection system 1...
Страница 306: ......
Страница 307: ...A B C D E F G H L M N P Motore 0 Engine 1...
Страница 460: ......
Страница 461: ...A B C D E F G H L M N P Impianto elettrico 0 Electric system 0...
Страница 530: ......
Страница 531: ...A B C D E F G H L M N P Indice degli argomenti 0 Subject index 0...
Страница 540: ......