IMD 100 Integration manual 4189360015 Rev. G
Product user documentation
Page 241 of 243
1. IMD evaluation
and purchase
•
Task:
Evaluation of the IMD
•
Who:
Customer buyers and
engineers
•
Supporting DEIF documents:
•
Datasheet
•
Function description
2. IMD integration
in the customer’s
product
•
Task:
Integrate the IMD in the turbine
systems.
•
Who:
Customers R&D.
•
Where:
Customers facility
•
Output:
•
Wiring diagram
•
Cabinets specifications
•
IMD configuration file
•
Controller application SW (not IMD
scope)
•
Supporting DEIF documents:
•
Datasheet
•
Function description
•
Integration manual
•
Addendum to installation manual
•
IMD Manager Installation
instructions
•
IMD Manager user manual
3. Installation
•
Task:
Install the IMD in the cabinet,
install the cabinet in the hub.
•
Who:
Installation personnel.
•
Where:
Customer’s production
facility.
•
Supporting DEIF documents:
•
Installation manual
•
Installation check list
•
Addendum to installation manual
4. Initial
configuration and
verification
•
Task:
•
Upgrade the IMD SW if needed
•
Configure the IMD with the
configuration file
•
Test the IMD installation
•
Who:
Commissioning or similar
personnel.
•
Where:
Customer’s production
facility
•
Supporting DEIF documents:
•
Initial configuration and
verification manual
•
Configuration and verification
check list
•
IMD Manager Installation
instructions
•
IMD Manager user manual
5. Commissioning
on site
•
Task:
Commission the whole
turbine
•
Who:
Commissioning personnel
•
Where:
Turbine erection site
•
Supporting DEIF documents:
•
None. This task is entirely
customer’s task based on
customer’s documentation
6. Service and
maintenance
•
Task:
•
Service of the IMD
•
Replacement (disposal) of IMD
•
Storage of spare parts
•
Who:
Service and warehouse
personnel.
•
Supporting DEIF documents:
•
Service and maintenance
manual
•
IMD Manager Installation
instructions
•
IMD Manager user manual
Figure 45 Tasks and documentation overview
The described product use-cycle might not apply as is for all customers, but the tasks are universal
and can therefore be adapted. For example, if the SW upgrade, configuration and verification is done
during the turbine commissioning, the applicable documentation can be used at this stage instead of a
separate stage at the end of production.