Piping Diagrams
SiBE37-701_B
403
Appendix
FXZQ
Refrigerant pipe connection port diameters
Heat exchanger
M
Fan
Th3
Th2
Th1
Gas pipe connection port
(flare connection)
Liquid pipe connection port
(flare connection)
Filter
Filter
Electronic
expansion valve
Th1: Thermistor for suction air temp.
Th2: Thermistor for liquid line temp.
Th3: Thermistor for gas line temp.
4D040157
(mm)
Model
Gas
Liquid
FXZQ20M / 25M / 32M / 40M / 50M
φ
12.7
φ
6.4
Содержание REYQ8-48PY1B
Страница 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Страница 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Страница 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Страница 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...