![Daikin REYQ8-48PY1B Скачать руководство пользователя страница 393](http://html.mh-extra.com/html/daikin/reyq8-48py1b/reyq8-48py1b_service-manual_502202393.webp)
SiBE37-701_B
Troubleshooting (OP: Unified ON/OFF Controller)
Troubleshooting
382
[CHECK 1]
Check on connector of fan motor (Power supply cable)
(1) Turn off the power supply.
Measure the resistance between phases of U,V,W at the motor side connectors (three-core
wire) to check that the values are balanced and there is no short circuiting, while connector
or relay connector is disconnected.
[CHECK 2]
(1) Turn off the power supply.
(2) Measure the resistance between Vcc and each phase of U,V,W, and GND and each phase
at the motor side connectors (five-core wire) to check that the values are balanced within the
range of ± 20 %, while connector or relay connector is disconnected.
Furthermore, to use a multiple meter for measurement, connect the probe of negative pole
to Vcc and that of positive pole to GND.
Red
U
Measure the resistance
values between phases
U,V,W.
White
Black
V
W
5 Gray
GND
Measure the resistance
values between Vcc
and U,V,W, and GND
and U,V,W.
4 Pink
3 Orange
2 Blue
1 Yellow
Vcc
W
V
U
Содержание REYQ8-48PY1B
Страница 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Страница 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Страница 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Страница 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...