SiBE37-701_B
Test Operation
Test Operation
162
Note:
After knocking out the holes, we recommend you remove burrs in the knock holes
(See
above figure)
and paint the edges and areas around the edges using the repair paint.
1.2.5 Additional Refrigerant Charge and Check Operation
The outdoor unit is charged with refrigerant when shipped from the factory, but depending on
the size and length of the piping when installed, it may require additional charging.
For charging the additional refrigerant, follow the procedure in this chapter.
And then carry out the check operation.
1.2.5.1
Before Working
[About the refrigerant cylinder]
Check whether the cylinder has a siphon pipe before charging and place the cylinder so that the
refrigerant is charged in liquid form. (See the figure below.)
Note:
Always use the proper refrigerant (R-410A). If charged with the refrigerant containing an
improper material, it may cause an explosion or accident.
R-410A is a mixed refrigerant, so charging it as a gas will cause the refrigerant composition
to change, which may prevent normal operation.
Caulking, etc.
Insulation material
Piping lead-out hole lid
Open a knock hole at “ ”.
Block “ ”.
Note: Total amount of refrigerant should be 100kg or less
With siphon pipe
Other tanks
Stand the cylinder upright and charge.
(The siphon pipe goes all the way inside,
so the cylinder does not need be put
upside-down charge in liquid form.)
Stand the cylinder upside-down and charge.
Содержание REYQ8-48PY1B
Страница 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Страница 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Страница 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Страница 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...