![Daikin REYQ8-48PY1B Скачать руководство пользователя страница 203](http://html.mh-extra.com/html/daikin/reyq8-48py1b/reyq8-48py1b_service-manual_502202203.webp)
SiBE37-701_B
Field Setting
Test Operation
192
<Setting confirmation screen>
(6)
Press Menu/Enter button. Setting
confirmation screen is displayed.
6
(7)
Press Menu/Enter button.
Setting confirmation
7
Select
Yes
and press Menu/
Enter button. Setting details are
determined and field setting list
screen returns.
8
In the case of multiple setting
changes, repeat “ (3) ” to “ (7) ”.
9
After all setting changes are com-
pleted, press Cancel button twice.
CAUTION
Backlight goes out, and
“Connection under check Please
wait for a moment” is displayed for
initialization. After the initialization,
the basic screen returns.
z
When an optional accessory is installed on the indoor unit, settings of the indoor unit may be
changed. See the manual of the optional accessory.
z
For field setting details of the outdoor unit, see installation manual attached to the outdoor unit.
10
Содержание REYQ8-48PY1B
Страница 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Страница 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Страница 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Страница 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...