![Daikin REYQ8-48PY1B Скачать руководство пользователя страница 395](http://html.mh-extra.com/html/daikin/reyq8-48py1b/reyq8-48py1b_service-manual_502202395.webp)
SiBE37-701_B
Troubleshooting (OP: Unified ON/OFF Controller)
Troubleshooting
384
[CHECK 4] Power Transistor Check
Perform the following procedures prior to check.
(1) Power Off.
(2) Remove all the wiring connected to the PCB where power transistors are mounted on.
[Preparation]
· Tester
* Preparing a tester in the analog system is recommended.
A tester in the digital system with diode check function will
be usable.
[Point of Measurement and Judgement Criteria]
· Measure the resistance value using a tester at each point of measurement below, 10 minutes later after power OFF.
To use analog tester:
Measurement in the resistance value mode in the range of
multiplying 1k
Ω
.
To use digital tester:
Measurement is executed in the diode check mode. (
)
No.
Point of Measurement
Judgement
Criteria
Remarks
No.
Point of Measurement
Judgement
Criteria
Remarks
+
–
+
–
1
P2
U
2 ~ 15k
Ω
1
P2
U
1.2V and over
Due to condenser charge and
so on, resistance measurement
may require some time.
2
P2
V
2
P2
V
3
P2
W
3
P2
W
4
U
P2
15k
Ω
and
above
(including
∞
)
Due to condenser
charge and so on,
resistance
measurement may
require some time.
4
U
P2
0.3 ~ 0.7V
5
V
P2
5
V
P2
6
W
P2
6
W
P2
7
N3
U
7
N3
U
8
N3
V
8
N3
V
9
N3
W
9
N3
W
10
U
N3
2 ~ 15k
Ω
10
U
N3
1.2V and over
Due to condenser charge and
so on, resistance measurement
may require some time.
11
V
N3
11
V
N3
12
W
N3
12
W
N3
[PCB and Circuit Diagram]
J1
J2
J3
P1
P3
N3 U
V
W
DM
P1
P2 P3
IGBT
X10A K2
L1
L2
L3
J1
J2
J3
N3
X11A
U
V
W
Содержание REYQ8-48PY1B
Страница 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Страница 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Страница 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Страница 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...