Test Operation
SiBE37-701_B
179
Test Operation
9.
Complete
The display on the remote controller shows a flashing "
PE
" code for signalling that automatic
charging will be finished in about 10 minutes.
When the unit stops operating, close valve A immediately and check the LEDs and check if
the "
P9
" code is displayed on the remote controller.
Note:
Always close valve A and remove the refrigerant tank immediately after finishing the refrigerant
charge operation.
The refrigerant charge port of these units have electronic expansion valves that will close
automatically when refrigerant charging operation has finished. However, the electronic
expansion valves will be opened when other operations start after finishing refrigerant charging
operation.
If the refrigerant tank is left with the valve open, the amount of refrigerant which is properly
charged may be off the point.
If the LED indication is not as shown above, correct the malfunction (as indicated in the display
of the remote controller) and restart the complete charging procedure. When the charging
amount is little, the "
PE
" code may not be displayed, but instead the "
P9
" code will be displayed
immediately.
10.
Press the
BS1 MODE
button once and the charging is complete.
Record the amount that was added on the additional refrigerant charge label provided with
the unit and attach it on the back side of the front panel.
Perform the test procedure as described in "Test operation" on page 186.
[Normal system display]
(a) The state of the H8P (multi) LED in a multi-system shows which unit is the master unit (
k
), slave 1 unit (
l
) or slave 2 unit (
h
).
Only the master unit is connected to the indoor units with interunit wiring.
LED display
(Default status
before delivery)
Micro-
Computer
operation
monitor
Mode
Ready/
Error
Cooling/Heating
changeover
Low
noise
Demand
Multi
Individual
Bulk
(master)
Bulk
(slave)
HAP
H1P
H2P
H3P
H4P
H5P
H6P
H7P
H8P
Single outdoor
unit system
l
h
h
k
h
h
h
h
h
Multiple
outdoor
unit
system
Master
unit
(a)
l
h
h
k
h
h
h
h
k
Slave
unit
1
(a)
l
h
h
h
h
h
h
h
l
Slave
unit
2
(a)
l
h
h
h
h
h
h
h
h
k l l k k k k
H1P
H2P H3P H4P
H5P
H7P
H6P
Содержание REYQ8-48PY1B
Страница 1: ...Service Manual REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701_B ...
Страница 456: ...Piping Installation Point SiBE37 701_B 445 Appendix ...
Страница 460: ...Example of connection SiBE37 701_B 449 Appendix ...
Страница 476: ...Revision History Date News No Contents 2010 9 10 M 10011 Correction of service manual ...