19-31
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 19 DLPs D200 to D299
DLP- D234 Roll the Source or Destination of One Optical Circuit
Figure 19-5
Selecting Single Roll Attributes
Step 6
Click
Next
.
Step 7
In the Pivot/Fixed Point 1 window, click the square in the graphic image that represents the facility that
you want to keep (
).
This facility is the fixed location in the cross-connect involved in the roll process. The identifier appears
in the text box below the graphic image.
The facility that is not selected is the Roll From path. The
Roll From path is deleted after the roll is completed.
Figure 19-6
Selecting a Path
Step 8
Click
Next
.
Step 9
In the Select New End Point area, choose the
Slot
,
Port
, and
VC4
from the drop-down lists to select the
Roll To facility (
HOP
HOP
VC4-*
VC4-*
VC4-*
VC4-*
VC4-*
VC4-*
HOP
VC4-*
134351
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...