1-14
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 1 Install the Shelf and FMECs
NTP- D222 Install the E1-75/120 Conversion Panel
Figure 1-3
Mounting the E1-75/120 Conversion Panel in a Rack
Step 2
Align the screw holes on the mounting ears with the mounting holes in the rack.
Step 3
Install one mounting screw in each side of the assembly.
Step 4
When the E1-75/120 conversion panel is secured to the rack, install the remaining mounting screws if
necessary.
Step 5
Continue with the
“NTP-D223 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections”
Stop. You have completed this procedure.
83912
Equipment rack
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...