6-6
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 6 Create Circuits and Low-Order Tunnels
NTP- D127 Verify Network Turn-Up
c.
Click the
Network
tab. Verify that the IP address, Subnet mask, Default Router, Prevent LCD IP
Config, and Gateway Settings are correctly provisioned. If not, make corrections using the
“NTP-D201 Change CTC Network Access” procedure on page 11-2
.
d.
Click the
Protection
tab. Verify that protection groups are created as specified in your site plan. If
the protection groups are not created, complete the
“NTP-D203 Modify or Delete Card Protection
Settings” procedure on page 11-5
e.
If the node is in an MS-SPRing, click the
MS-SPRing
tab. (If the node is not in an MS-SPRing,
continue with Step
.) Verify that the following items are provisioned as specified in your site plan:
•
MS-SPRing type (2-fiber or 4-fiber)
•
MS-SPRing ring ID and node IDs
•
Ring reversion time
•
East and west card assignments
•
(4-fiber MS-SPRings only) Span reversion and east/west protect card assignments
If you need to make corrections, see the
“NTP-D40 Provision MS-SPRing Nodes” procedure on
for instructions.
f.
Click the
Security
tab. Verify that the users and access levels are provisioned as specified. If not,
see the
“NTP-D30 Create Users and Assign Security” procedure on page 4-4
information.
g.
If Simple Network Management Protocol (SNMP) is used, click the
SNMP
tab and verify the trap
and destination information. If the information is not correct, see the
Settings” procedure on page 11-7
to correct the information.
h.
Click the
Comm Channels
tab. Verify that DCCs were created to the applicable STM-N slots and
ports. If DCCs were not created for the appropriate STM-N slots and ports, see
and complete the turn-up procedure appropriate for your network topology.
i.
Click the
Timing
tab. Verify that timing is provisioned as specified. If not, use the
Change Node Timing” procedure on page 11-6
j.
Click the
Alarm Profiles
tab. If you provisioned optional alarm profiles, verify that the alarms are
provisioned as specified. If not, see the
“NTP-D71 Create, Download, and Assign Alarm Severity
Profiles” procedure on page 9-6
to change the information.
k.
Verify that the network element (NE) defaults listed in the status area of the node view window are
correct.
Step 7
Repeat
Step 8
Complete the appropriate circuit creation procedure from the NTP list in the
.
Stop. You have completed this procedure.
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...