13-3
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 13 Convert Network Configurations
NTP- D338 Convert a Point-to-Point to a Linear ADM Automatically
Note
If you are attempting to add an unreachable node you must first log in to the unreachable node
using a separate CTC session and configure that node. Delete any existing protection groups as
described in the
“DLP-D155 Delete a Protection Group” task on page 18-47
. Delete any existing
SDH DCC terminations as described in the
“DLP-D360 Delete a Regenerator-Section DCC
Termination” task on page 20-66
Step 6
Enter the node host name or IP address or choose the name of the new node from the drop-down list. If
you type in the name, make sure it is identical to the actual node name. The node name is case sensitive.
Step 7
When you have the name of the node in the menu, click
Next
. The Select Protection Group Ports page
appears (
Step 8
From the drop-down lists, select the working and protect ports on the new node that you want to connect
to each terminal node.
Figure 13-1
Selecting Protection Group Ports
Step 9
Click
Next
. The Re-fiber the Protected Path dialog box appears (
Figure 13-2
Refibering the Protect Path
Step 10
Follow the instructions on the page for connecting the fibers between the nodes.
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...