5-6
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 5 Turn Up a Network
NTP- D339 Point-to-Point Network Acceptance Test
b.
Connect the test set receive (Rx) connector to the circuit transmit (Tx) connector on the circuit
source card.
Step 11
Verify that the test set shows a clean signal. If a clean signal is not present, repeat Steps
through
make sure the test set and cabling are configured correctly.
Step 12
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
again, refer to the next level of support.
Step 13
Inject BIT errors from the test set. Verify that the errors appear at the test set, indicating a complete
end-to-end circuit.
Step 14
Complete the
“DLP-D254 TCC2/TCC2P Card Active/Standby Switch Test” task on page 19-59
Step 15
Complete the
“DLP-D255 Cross-Connect Card Side Switch Test” task on page 19-60
.
Step 16
Complete the
“DLP-D88 Optical 1+1 Protection Test” task on page 17-81
.
Step 17
Set up and complete a bit error rate (BER) test. Use the existing configuration and follow your site
requirements for the specified length of time. Record the test results and configuration.
Step 18
Remove any loopbacks, switches, or test sets from the nodes after all testing is complete.
Step 19
From the View menu, choose
Go to Network View
.
Step 20
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-D227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
them before continuing. Refer to the
Cisco ONS 15454 SDH Troubleshooting Guide
if necessary.
c.
Complete the
“DLP-D147 Export CTC Data” task on page 18-38
to export the alarm information.
Step 21
Repeat Steps
through
for the other point-to-point node.
Step 22
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
again, refer to the next level of support.
Step 23
Delete the test circuit. See the
“DLP-D27 Delete Circuits” task on page 17-21
.
After all tests are successfully completed and no alarms exist in the network, the network is ready for
service application.
Stop. You have completed this procedure.
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...