6-35
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 6 Create Circuits and Low-Order Tunnels
NTP- D55 Create a Manually Routed Low-Order VC3 Circuit
Step 21
Complete the
“NTP-D135 Test Low-Order Circuits” procedure on page 6-53
. Skip this step if you built
a test circuit.
Stop. You have completed this procedure.
NTP-D55 Create a Manually Routed Low-Order VC3 Circuit
Step 1
Complete the
“DLP-D60 Log into CTC” task on page 17-49
at an ONS 15454 SDH on the network
where you will create the circuit. If you are already logged in, continue with
Step 2
On the shelf graphic, verify that XC-VXL-10G or XC-VXL-2.5G cross-connect cards are installed in
Slots 8 and 10.
Step 3
If you want to assign a name to the circuit source and destination ports before you create the circuit,
complete the
“DLP-D314 Assign a Name to a Port” task on page 20-7
. If you want CTC to assign a name
automatically based on circuit type, node name, and sequence number, continue with
.
Step 4
From the View menu, choose
Go to Network View
.
Step 5
Click the
Circuits
tab, then click
Create
.
Step 6
In the Circuit Creation dialog box, complete the following fields:
•
Circuit Type—Choose
VC_LO_PATH_CIRCUIT
.
•
Number of Circuits—Enter the number of VC3 circuits that you want to create. The default is 1. If
you are creating multiple circuits with the same slot and consecutive port numbers, you can use
Auto-ranged to create the circuits automatically.
•
Auto-ranged—This check box is automatically selected if you enter more than 1 in the Number of
Circuits field. Auto-ranging creates identical (same source and destination), sequential circuits
automatically. Uncheck the box if you do not want CTC to create sequential circuits automatically.
Step 7
Click
Next
.
Step 8
Define the circuit attributes (
•
Name—Assign a name to the circuit. The name can be alphanumeric and up to 48 characters,
(including spaces). Circuit names should be 44 characters or less if you want the ability to create
monitor circuits. If you leave the field blank, CTC assigns a default name to the circuit.
•
Size—Choose
VC3
.
•
Create cross-connects only (TL1-like)—Check this check box if you want to create one or more
cross-connects to complete a signal path for TL1-generated circuits. If you check this box, low-order
tunnels and Ethergroup sources and destinations are unavailable.
Purpose
This procedure creates low-order VC3 circuit and allows you to provision
the circuit route.
Tools/Equipment
XC-VXL-10G or XC-VXL-2.5G cards must be installed at the circuit
source and destination nodes.
Prerequisite Procedures
NTP-D127 Verify Network Turn-Up, page 6-5
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...