17-32
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 17 DLPs D1 to D99
DLP- D40 Create a Provisionable Patchcord
Step 1
In node view, click the
Provisioning > Comm Channels > PPC
tabs. If you are in network view, click
the
Provisioning >
Provisionable Patchcords
tabs.
Step 2
Click
Create
. The Provisionable Patchcord dialog box appears.
Step 3
In the Origination Node area, complete the following:
a.
If you are in node view, the Origination Node defaults to the current node. If you are in network
view, click the desired origination node from the drop-down list.
b.
Type a patchcord identifier (0 through 32767) in the TX/RX ID field.
c.
Click the desired origination slot/port from the list of available slots/ports.
Step 4
In the Termination Node area, complete the following:
a.
Click the desired termination node from the drop-down list. If the remote node has not previously
been discovered by CTC but is accessible by CTC, type the name of the remote node.
b.
Type a patchcord identifier (0 through 32767) in the TX/RX ID field. The origination and
termination IDs must be different if the patchcord is set up between two cards on the same node.
c.
Click the desired termination slot/port from the list of available slots/ports. The origination port and
the termination port must be different.
Step 5
If you need to provision Tx and Rx separately for multiplexer/demultiplexer cards, check the
Separate Tx/Rx
check box. If not, continue with
. The origination and termination TX ports are
already provisioned. Complete the following to provision the RX ports:
a.
In the Origination Node area, type a patchcord identifier (0 through 32767) in the RX ID field. The
origination Tx and Rx and termination Tx and Rx IDs must be different.
b.
Click the desired origination slot/port from the list of available slots/ports.
c.
In the Termination Node area, type a patchcord identifier (0 through 32767) in the RX ID field. The
origination Tx and Rx and termination Tx and Rx IDs must be different.
d.
Click the desired termination slot/port from the list of available slots/ports.
Step 6
Click
OK
.
Step 7
If you provisioned a patchcord on a port in a 1+1 protection group, a dialog box appears to ask if you
would like to provision the peer patchcord. Click
Yes
.
Repeat Steps
for the peer patchcord.
Step 8
Return to your originating procedure (NTP).
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...