6-106
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 6 Create Circuits and Low-Order Tunnels
NTP- D350 Create a Server Trail
Stop. You have completed this procedure.
NTP-D350 Create a Server Trail
Note
You cannot create server trails on ports with DCC links.
Step 1
Complete the
“DLP-D60 Log into CTC” task on page 17-49
at the node where you will create the circuit.
If you are already logged in, continue with
Step 2
From the View menu, choose
Go to Network View
.
Step 3
Click the
Provisioning > Server Trails
tabs.
Step 4
Click
Create
.
Step 5
In the Server Trail Creation dialog box, complete the following fields:
•
Type—Choose
VC_HO_PATH_CIRCUIT
or
VC_LO_PATH_CIRCUIT
.
•
Size—Depending on the type selected, choose the server trail size. For VC_HO_PATH_CIRCUIT,
choose
VC4-2c
,
VC4-3c
,
VC4-4c
,
VC4-6c
,
VC4-8c
,
VC4-12c
,
VC4-16c
,
VC4-64c
, or
VC4
. For
VC_LO_PATH_CIRCUIT, choose
VC3
,
VC12
, or
VC11
.
•
Protection Type—Choose one of the following protection types:
Preemptible
,
Unprotected
, or
Fully Protected
. The server trail protection determines the protection type for any circuits that
traverse it.
•
Number of Trails—Enter the number of server trails.
You can create multiple server trails from the
same port. The maximum number is determined by how many circuits of a particular server trail size
can be supported on the port.
•
SRLG—Enter a value for the Shared Resource Link Group (SRLG). SRLG is used by
Cisco Transport Manager (CTM) to specify link diversity. The SRLG field has no restrictions. If you
create multiple server trails from one port, you can assign the same SRLG value to all the links to
indicate that they originate from the same port.
Step 6
Click
Next
.
Step 7
In the Source area, complete the following:
a.
From the Node drop-down list, choose the node where the source will originate.
b.
From the Slot drop-down list, choose the slot.
c.
From the Port drop-down list, choose the port.
Purpose
This procedure creates a server trail, which provides a connection between
ONS nodes through a third-party network. You can create server trails
between any two STM-N or EC1 ports.
Tools/Equipment
None
Prerequisite Procedures
NTP-D127 Verify Network Turn-Up, page 6-5
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...