19-41
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 19 DLPs D200 to D299
DLP- D238 Roll Two Cross-Connects from One Optical Circuit to a Second Optical Circuit
Note
You cannot complete a roll if you cancelled the sibling roll. You must complete the two rolls
together.
Step 20
For both manual and automatic rolls, click
Finish
to complete the circuit roll process.
Step 21
Return to your originating procedure (NTP).
DLP-D238 Roll Two Cross-Connects from One Optical Circuit to a Second
Optical Circuit
Step 1
From the View menu, choose
Go To Network View
.
Step 2
Click the
Circuits
tab.
Step 3
Press
Ctrl
and click the two circuits that you want to use in the roll process.
The Roll From path will be on one circuit and the Roll To path will be on the other circuit. The circuits
must have a DISCOVERED status and must be the same size and direction for you to start a roll. The
planned Roll To circuit must not carry traffic. The first Roll To path must be DCC connected to the source
node of the Roll To circuit, and the second Roll To path must be DCC connected to the destination node
of the Roll To circuit.
Step 4
From the Tools menu, choose
Circuits > Roll Circuit
.
Step 5
In the Roll Attributes area, complete the following:
a.
From the Circuit Roll Mode drop-down list, choose
Auto
to create an automatic roll (required for a
1-way source roll) or
Manual
to create a manual roll (required for 1-way destination roll).
b.
From the Circuit Roll Type drop-down list, choose
Dual.
c.
In the Roll From Circuit area, click the circuit that contains the Roll From path.
Step 6
Click
Next
.
Step 7
In the Pivot/Fixed Point 1 window, click the square representing the fixed path of the first cross-connect
to be rolled (
This path is a fixed point in the cross-connect involved in the roll process. The path identifier appears in
the text box below the graphic image. The path that is not selected contains the Roll From path. The
Roll From path is deleted after the roll is completed.
Step 8
Click
Next
.
Purpose
This task reroutes a network path using two optical circuits by allowing
CTC to select the Roll To path on the second circuit automatically.
Tools/Equipment
None
Prerequisite Procedures
DLP-D60 Log into CTC, page 17-49
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning and higher
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...