FI002K0018v1530hUK – THS/21 Instruction manual for installation, use and maintenance
3
INSTALLATION
ORIGINAL
INSTRUCTION
73
3.3.3 Integrated
systems
Position the CEIA integrated system directly on
the production line.
Adjust the height of the conveyor belt so that it
is aligned with the production line. To do this,
adjust the height of the four feet or the four
castors.
Loosen the lock nut and turn the pin to raise or
lower the foot as required.
When you have adjusted the height, lock the
lock nuts and then brake the castors with the
locking lever or anchor the four feet to the floor.
Warning!
Some models can have a high centre of gravity. While moving and carrying out
the installation procedure, take precautions to ensure that the detector cannot fall over. Once
installation is completed, the structure to which the Metal Detector is attached must ensure
its stability.
Important!
When you adjust the height of the CEIA integrated system, ensure that the sling
surface remains parallel with the floor.
Do not install any device on the conveyor belt structure.
Do not modify the original wiring. Do not add additional wiring on the conveyor belt.
Do not change any electrical or mechanical part of the conveyor belt structure.
Do not install any devices or wiring at distances less than those specified in paragraph 3.1.2.2.
3.3.3.1 External signalling unit (beacon)
The beacon volume can be aduste by rotating the upper
part og the signalling unit, only on IP67 models.
Type of sound
Model
Volume
2.9 kHz
Adjustable on
IP67 models
94 dB max
Fixed on IP69K
models
65 dB
3.4 Pneumatic
installation
This section only refers to CEIA Integrated Systems fitted with an ejector.
3.4.1 Minimum
requirements
The mains compressed air supply must be compliant with the
ejector installed on the System. A label with all technical data
is located near the compressed air circuit input.
Example