![Ceia THS/21 Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/ceia/ths-21/ths-21_instruction-manual-for-installation-use-and-maintenance_2579009067.webp)
FI002K0018v1530hUK – THS/21 Instruction manual for installation, use and maintenance
3
INSTALLATION
ORIGINAL
INSTRUCTION
67
Put the Power Supply Box down
on the floor and remove the
protective support.
Using cutters, cut and remove all
plastic straps from the Probe.
The Metal Detector is ready for
installation.
3.2.1.3 Packing list
The package contains:
-
THS Metal Detector Probe connected to the power supply box ordered
-
Warnings Manual, Operator Manual and a sheet with a unique code to download all
Installation, Maintenance and Programming Manuals
-
Quality Control Test Samples (if ordered)
3.2.1.4 Moving the Metal Detector
Before you move the detector, check its weight. It could be too heavy to be handled by one person. Use suitable handling
methods and tools. CEIA declines all liability for damages arising from incorrect handling of the container.
Use forklift trucks or sling the load-bearing structure. Ensure that the load is balanced during
movement. Avoid deforming the structure or its component parts.
When transporting and handling the Metal Detector DO NOT pass slings, ropes, forklift forks, hands or any other lifting
equipment through the Probe aperture.
Other transport methods are forbidden.