FI002K0018v1530hUK – THS/21 Instruction manual for installation, use and maintenance
3
INSTALLATION
ORIGINAL
INSTRUCTION
71
3.3 Mechanical
installation
3.3.1 Probe
3.3.1.1 THS
Models
Insert the Probe onto the structure of the production line and fix it with screws and plastic spacers,
using the holes provided on the underside.
For the fixing distances see the
Dimensions
section for the relevant model, in chapter
2 –
Description
of this manual.
For Detection Probes with a rectangular opening, fasten the Detection Probe with the holes in the
support feet, using screws of the appropriate length which never come into contact with the Detection
Probe frame.
THS/MN THS/SL
Other
THS
models
S
: Detection Probe;
P
: Support;
d
: Plastic spacer;
e
: Insulating bush
WARNING!
The Detection Probe with rectangular opening is fitted with appropriate insulated support feet. The Detection
Probe structure is connected to earth with the connection cable with the power supply unit;
it must not be connected to
other metal parts and
the support feet must always be insulated.
3.3.1.2 THS/G
models
On circular tunnel Probes, for free-falling applications, insert the Detection Probe on the material
inspection pipe. Fix it in position using the screws and plastic spacers as shown in the figures below;
use the holes on the Detection Probe side where the connection cable to the power supply box is
present.
S: Detection Probe; P: Support frame; d: Plastic spacer;
e
: Insulating bush
WARNING!
Do not perform any mecanichal operation on the Probe structure, such as weldings or drilling.
Do not remove the support feet and do not perform mechanical or electric connections on them.