![Atmel SAM4S Series Скачать руководство пользователя страница 492](http://html1.mh-extra.com/html/atmel/sam4s-series/sam4s-series_preliminary-data-sheet_3003408492.webp)
492
11100B–ATARM–31-Jul-12
SAM4S Series [Preliminary]
27.2.14
Clock Switching Details
27.2.14.1
Master Clock Switching Timings
and
give the worst case timings required for the Master Clock to switch
from one selected clock to another one. This is in the event that the prescaler is de-activated.
When the prescaler is activated, an additional time of 64 clock cycles of the newly selected clock
has to be added.
Notes:
1. PLL designates either the PLLA or the PLLB Clock.
2. PLLCOUNT designates either PLLACOUNT or PLLBCOUNT.
Table 27-1.
Clock Switching Timings (Worst Case)
From
Main Clock
SLCK
PLL Clock
To
Main Clock
–
4 x SLCK +
2.5 x Main Clock
3 x PLL Clock +
4 x SLCK +
1 x Main Clock
SLCK
0.5 x Main Clock +
4.5 x SLCK
–
3 x PLL Clock +
5 x SLCK
PLL Clock
0.5 x Main Clock +
4 x SLCK +
PLLCOUNT x SLCK +
2.5 x PLLx Clock
2.5 x PLL Clock +
5 x SLCK +
PLLCOUNT x SLCK
2.5 x PLL Clock +
4 x SLCK +
PLLCOUNT x SLCK
Table 27-2.
Clock Switching Timings between Two PLLs (Worst Case)
From
PLLA Clock
PLLB Clock
To
PLLA Clock
2.5 x PLLA Clock +
4 x SLCK +
PLLACOUNT x SLCK
3 x PLLA Clock +
4 x SLCK +
1.5 x PLLA Clock
PLLB Clock
3 x PLLB Clock +
4 x SLCK +
1.5 x PLLB Clock
2.5 x PLLB Clock +
4 x SLCK +
PLLBCOUNT x SLCK
Содержание SAM4S Series
Страница 44: ...44 11100B ATARM 31 Jul 12 SAM4S Series Preliminary ...
Страница 412: ...412 11100B ATARM 31 Jul 12 SAM4S Series Preliminary ...
Страница 1105: ...1105 11100B ATARM 31 Jul 12 SAM4S Series Preliminary ...
Страница 1142: ...1142 11100B ATARM 31 Jul 12 SAM4S Series Preliminary Figure 43 3 100 ball VFBGA Package Drawing ...
Страница 1143: ...1143 11100B ATARM 31 Jul 12 SAM4S Series Preliminary Figure 43 4 64 lead LQFP Package Drawing ...
Страница 1145: ...1145 11100B ATARM 31 Jul 12 SAM4S Series Preliminary Figure 43 5 64 lead QFN Package Drawing ...