AMD2000 Series - Servo Drive - User Manual
68
DS619-0-00-0019 - Rev 0
ANCA Motion
8.
Installation Checklist
8.1
What this Chapter Contains
This chapter contains a pre power up checklist aimed at ensuring safe and successful initial power up of the
drive.
8.2
Checklist
The installation location satisfies the requirements in
12.6.13 Installation and Operation
An adequately sized protective earth connector is installed between the drive and the
installation Earth Bar
The required ventilation clearances around the drive have been observed per section
4
Mechanical Installation
An adequately sized protective earth connector is installed between the drive and the
motor.
Each protective earth conductor is connected to the appropriate terminal and is
secured.
The supply voltage is within the limits of operation of the drive.
The input power cable is connected to the appropriate terminals and the conductors are
secured.
Appropriate supply fuses and disconnect devices have been installed.
The motor cable is connected to the appropriate terminals, the phase order is correct
and the conductors are secured.
The brake resistor cable (if applicable) has been connected to the appropriate terminals
and the connections secure
The motor cable and brake resistor cable (if applicable) have been routed away from
other cables
No power factor compensation capacitors have been connected to the motor cable
A sinusoidal filter has been installed in between the motor armature output on the drive
and the motor if required by the application
All low voltage control cables have been correctly connected and are secure
There is no dust or other foreign object inside the drive after installation (E.g. Due to
cutting of cables etc.)
All wiring conforms to applicable regulations and standards
No physical damage is present to any component within the system
The motor and all equipment connected to the drive is ready for start-up
A risk assessment has been completed on entire machine and is considered by the
user to be safe enough for operation