![Amazone Cataya 3000 Super Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/amazone/cataya-3000-super/cataya-3000-super_operating-manual_2919712007.webp)
Cataya Super BAH0087-11 01.19
7
to ensure steering capability ................................................................................................ 118
6.1.1.3
Calculation of the actual front axle load of the tractor T
V tat
................................................. 118
6.1.1.4
Calculation of the actual total weight of the combined tractor and implement .................... 118
6.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
.................................................. 118
6.1.1.6
Load-bearing capacity of the tractor tyres ........................................................................... 118
6.1.1.7
Table .................................................................................................................................... 119
6.2
Secure the tractor / implement against unintentional starting and rolling away ................. 120
7
Coupling and uncoupling the implement .............................................. 121
7.1
Hydraulic hose lines ............................................................................................................. 123
7.1.1
Coupling the hydraulic hose lines ........................................................................................ 123
7.1.2
Disconnecting the hydraulic hose lines ................................................................................ 124
7.2
Coupling and uncoupling implements .................................................................................. 125
7.2.1
Coupling - Tractor and soil tillage implement ....................................................................... 127
7.2.1.1
Installation of the analogue working position sensor ........................................................... 128
7.3
Coupling - Pack top seed drill and soil tillage implement .................................................... 130
7.3.1
Uncoupling – Combination and tractor ................................................................................ 134
7.3.2
Uncoupling – Soil tillage implement and pack top seed drill ............................................... 135
7.4
Checking the tramline track width ........................................................................................ 140
7.5
Checking the tramline wheelmark width .............................................................................. 140
8
Settings ..................................................................................................... 141
8.1
Folding the steps up and down ............................................................................................ 142
8.2
Fill the seed hopper ............................................................................................................. 144
8.3
Setting the seed rate ............................................................................................................ 147
8.3.1
Bottom flap position ............................................................................................................. 147
8.3.2
Sliding shutter position ......................................................................................................... 148
8.3.3
Agitator shaft support ........................................................................................................... 149
8.3.3.1
Agitator shaft support (implements with star wheel drive) ................................................... 149
8.3.3.2
Agitator shaft support (implements with electric metering drive) ......................................... 150
8.4
Calibrating the seed rate ...................................................................................................... 151
8.4.1
Calibrating the seed rate - implements with star wheel drive .............................................. 153
8.4.1.1
Preparing the implement for calibration ............................................................................... 153
8.4.1.2
Determining the gearbox setting using the calculating disc rule .......................................... 157
8.4.2
Calibrating the seed rate Implements with AmaDrill 2 control terminal, Implements
with ISOBUS system ............................................................................................................ 158
8.5
Moving the star wheel from working to transport position and vice-versa ........................... 159
8.5.1
Star wheel spring force support ........................................................................................... 160
8.6
RoTeC Control coulter ......................................................................................................... 161
8.6.1
Adjusting and checking the seed placement depth ............................................................. 161
8.6.1.1
Adjusting the depth control discs / wheels ........................................................................... 162
8.7
TwinTeC double disc coulter ................................................................................................ 164
8.7.1
Adjusting and checking the seed placement depth ............................................................. 164
8.8
Coulter pressure, seed rate increase and coulter lift ........................................................... 168
8.8.1
Coulter pressure / coulter lift (manually actuated) ............................................................... 168
8.8.2
Coulter pressure, seed rate increase and coulter lift (hydraulically actuated) .................... 169
8.8.2.1
Increasing / reducing the coulter pressure ........................................................................... 170
8.8.2.2
Adjusting the seed rate increase ......................................................................................... 170
8.8.2.3
Soil tillage without seeding (coulter lift) ................................................................................ 171
8.9
Adjusting the exact following harrow ................................................................................... 172
8.9.1
Adjusting the exact following harrow tines ........................................................................... 172
8.9.2
Setting the exact following harrow pressure ........................................................................ 173
8.9.3
Moving the exact following harrow to the working/transport position .................................. 174
8.9.3.1
Move the exact following harrow into working position ........................................................ 174
8.9.3.2
Moving the exact following harrow into transport position ................................................... 174
8.9.4
Seeding without exact following harrow (exact following harrow lift) ................................... 174
8.10
Adjusting the roller harrow ................................................................................................... 175
8.10.1
Roller harrow tines - Adjusting the pitch .............................................................................. 175
8.10.2
Roller harrow tines - Adjusting the working depth ............................................................... 175
8.10.3
Setting the roller contact pressure ....................................................................................... 176
Содержание Cataya 3000 Super
Страница 27: ...General safety instructions Cataya Super BAH0087 11 01 19 27 Fig 3 Fig 4 ...
Страница 42: ...Product description 42 Cataya Super BAH0087 11 01 19 Fig 13 Cataya 3000 Super mounted on CombiDisc 3000 ...
Страница 107: ...Layout and function Cataya Super BAH0087 11 01 19 107 Fig 119 ...
Страница 247: ...Hydraulic diagram Cataya Super BAH0087 11 01 19 247 Fig 338 ...
Страница 249: ...Hydraulic diagram Cataya Super BAH0087 11 01 19 249 Fig 339 ...
Страница 250: ......
Страница 251: ......