External activation of ZCVPSOF..................................................60
Automatic initiation of ZCVPSOF.................................................61
Completing the test.......................................................................61
Testing current protection functions........................................................61
Instantaneous phase overcurrent protection 3-phase output
PHPIOC (50)......................................................................................61
Instantaneous phase overcurrent protection phase segregated
output SPTPIOC (50)........................................................................62
Completing the test.......................................................................63
Four step phase overcurrent protection 3-phase output
OC4PTOC (51_67)............................................................................63
Verifying the settings....................................................................63
Completing the test.......................................................................64
Four step phase overcurrent protection phase segregated
output OC4SPTOC (51_67)...............................................................64
Verifying the settings....................................................................65
Completing the test.......................................................................66
Instantaneous residual overcurrent protection EFPIOC (50N)..........66
Measuring the operate limit of set values.....................................66
Completing the test.......................................................................67
Four step residual overcurrent protection, zero or negative
sequence direction EF4PTOC (51N/67N).........................................67
Four step directional residual overcurrent protection ..................67
Four step non-directional residual overcurrent protection............68
Completing the test.......................................................................68
Sensitive directional residual overcurrent and power protection
SDEPSDE (67N)................................................................................68
Measuring the operate and time limit for set values.....................68
Completing the test.......................................................................74
Thermal overload protection, one time constant, Fahrenheit/
Celsius LFPTTR/LCPTTR (26)..........................................................74
Testing the protection without external temperature
compensation (NonComp)............................................................74
Completing the test.......................................................................75
Breaker failure protection, phase segregated activation and
output CCRBRF (50BF).....................................................................75
Checking the phase current operate value,
Checking the residual (ground fault) current operate value
Pickup_N set below Pickup_PH....................................................76
Table of contents
3
Commissioning Manual
Содержание Relion 650 Series REL650
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Commissioning Manual ...
Страница 2: ......
Страница 8: ......
Страница 22: ...14 ...
Страница 44: ...36 ...
Страница 52: ...44 ...
Страница 156: ...148 ...
Страница 166: ...158 ...
Страница 175: ...167 ...